Posted on 01/02/201814/03/2018Lights, Camera, Action Yes! after the main build, electrics, walls and floor and paint, we’re done. Lights camera action…..The SixtyFive is Alive.
Posted on 02/01/201814/03/2018Decorating Windows and doors, electrics and internet done. Inner walls and ceiling all painted. Just the floor to go.
Posted on 01/01/201814/03/2018The build is on The main base for the studio has been levelled. The decking created, and the studio erected. Shame the rocking chair needs work, I could do with a sit down.